Attached are some pictures of the work that has taken place at Pine Glen.   This summer there was an asbestos abatement of the entire first floor and the carpeting was removed in the library.  We are looking forward to starting the year with our new floors and new carpeting in the library.    Also witnessed in August was removal of all the sand in the playground area.  We are thrilled to have new topsoil on the playground area along with a new paved path and beautiful landscaping.   An additional cause for celebration was the arrival of 10 new “Bob Carts” (computer stations for the classrooms) and exterior painting of the building.  I hope everyone is enjoying there summer and look forward to seeing everyone in the fall. 